Universal Material Testing Machine Maintenance

- Nov 01, 2019-

1. Before working, check the reducer under the work desk, whether there is lubricating oil.

2. The grease in the bearings at both ends of the screw is generally changed once in 3-5 years.

3. The screw and silk mother of the test machine are added to the grease every six months. 

4. Keep the test machine clean.